Hire Epicor Kinetic Planning Devs

C# Experts for Epicor Kinetic Production Planning Success
Smartbrain.io’s unique selling point: domain-trained engineers only. Average hiring time is 5 days.
• Lightning-fast onboarding
• Senior-level vetting only
• Month-to-month contracts
image 1image 2image 3image 4image 5image 6image 7image 8image 9image 10image 11image 12

Why outstaff instead of direct hiring?
  • Cut time-to-productivity: deploy C# specialists already fluent in Epicor Kinetic Production Planning workflows within days, not months.
  • Lower total cost: one predictable monthly rate—no recruitment fees, HR taxes, or idle bench costs.
  • Elastic capacity: scale your Epicor team up or down as demand shifts.
  • Zero compromise on IP & quality: every engineer signs strict NDAs and codes to SOLID & Epicor best practices.
  Stay focused on revenue while we supply the talent.
Search
5-Day Hiring
Cost Predictability
Domain-Trained Engineers
Scalable Teams
Strict NDAs
Timezone Overlap
Epicor Certified
Zero Recruitment Fees
Seamless Integration
Flexible Contracts
Quality First
Retention Guarantee

What CTOs Say

Challenge → legacy C# code caused missed schedules.
  Solution → Smartbrain sent two vetted developers in 4 days; they rewrote the scheduling module and integrated Epicor APIs.
  Impact → on-time orders jumped 28 %, QA bugs fell 35 %.

Megan Carter

CTO

Velocity Auto Components

Problem: MRP run took 3 h nightly.
  Fix: Your C# augmentation team refactored LINQ queries and added async workers.
  Result: runtime down to 19 min, freeing overnight capacity and saving $42 k/yr Azure spend.

Daniel Brooks

VP Engineering

NovaWave Circuits

Before: manual lot tracking slowed compliance audits.
  After: Smartbrain.io’s C# dev added barcode modules and Epicor REST hooks.
  Outcome: audit prep time cut from 6 days to 1 day; productivity up 22 %.

Linda Perez

Quality Director

Harvest Valley Foods

Issue: change-order chaos.
  Action: two Smartbrain C# pros built rule-based rescheduling engine.
  Gain: ECO processing time slashed 70 %, freeing engineers for R&D and hitting FDA deadlines.

Chris Johnson

Manufacturing IT Lead

PulseMed Instruments

Need: fast seasonal capacity planning.
  Delivery: Augmented C# squad created AI-aided forecasting micro-service plugged into Epicor.
  Benefit: stock-out events down 31 % and markdowns cut $0.9 M.

Jessica Smith

Operations Manager

UrbanThreads Co.

Situation: batch sequencing errors caused re-work.
  Solution: Smartbrain C# expert introduced genetic-algorithm scheduler inside Epicor.
  Result: re-work down 18 %, gross margin up 3.2 pp within a quarter.

Robert Lee

Plant Systems Supervisor

BlueRiver Chemicals

Industries We Empower

Automotive Manufacturing

Epicor Kinetic Production Planning keeps assembly lines synced with just-in-time supply. Outstaffed C# developers tune constraint-based schedules, integrate PLC data, and build dashboard add-ons that slash downtime and enhance Toyota-style lean throughput across global plants.

Electronics & PCB

High-mix, low-volume lots demand rapid changeovers. Our augmented C# talent customizes Epicor’s MRP rules, automates SMT feeder planning, and links MES scanners—providing second-by-second insights that boost first-pass yield and accelerate new-product introduction.

Food & Beverage

Compliance and shelf-life constraints complicate scheduling. Smartbrain’s Epicor Kinetic experts craft allergen-aware algorithms, barcode tracking, and temperature-chain dashboards using robust C# add-ins—cutting waste and audit prep time while safeguarding FDA & HACCP mandates.

Medical Devices

Regulated documentation and ECOs strain resources. Outstaffed C# engineers extend Epicor with validation logs, UDI serialization, and traceability workflows, ensuring ISO 13485 adherence and shortening engineering-change cycles without ballooning headcount.

Pharmaceutical

Batch potency, expiry, and GMP rules require precision. Our specialists embed calculation engines and CFR 21-part-11 signatures via C#, automating Epicor Kinetic Production Planning for sterile & bulk lines and achieving real-time ‘review-by-exception’ release.

Aerospace & Defense

Complex BOMs and ITAR controls necessitate deep customization. Augmented C# pros integrate Epicor with PLM, create MIL-STD compliant routing logic, and deliver secure role-based portals that keep programs on schedule and audit-ready.

Chemicals

Variable batch reactors and hazardous material rules call for smart sequencing. Our C# devs craft rule-driven Epicor plugins calculating tank turns, cleaning cycles, and regulatory labels—raising OEE while protecting EH&S standards.

Apparel & Retail

Fast-fashion volatility means constant re-forecasting. Smartbrain outstaffed engineers bolt AI demand models and UPC scanning to Epicor, automating cutting tickets and reducing over-production costs across global sourcing hubs.

Industrial Equipment

Engineer-to-order workflows can stall cash flow. C# experts extend Epicor Kinetic’s configurator, auto-generating BOMs, routings, and capacity reservations—compressing quote-to-ship timelines and driving on-time delivery scores upward.

Epicor Kinetic Production Planning

Pharma Batch Scheduler Revamp

Client: Mid-sized pharmaceutical CDMO

Challenge: Epicor Kinetic Production Planning struggled with overlapping batch reservations, risking FDA violations.

Solution: A three-person augmented C# team re-engineered the finite-capacity algorithm, introduced clean SOLID modules, and added CFR-21 audit trails.

Result: 37 % reduction in scheduling conflicts, 15 % faster release-to-market and zero compliance findings in the following FDA inspection.

Automotive Tier-1 Capacity Lift

Client: Global brake-system supplier

Challenge: Epicor Kinetic Production Planning could not keep pace with kanban demand spikes.

Solution: Two Smartbrain C# developers refactored MRP logic, added real-time IoT feedback, and deployed Azure Functions for load-balancing calculations.

Result: Line idle time fell by 24 %; order fulfilment hit 98 %; $1.1 M annual overtime spend eliminated.

Electronics OEM Lead-Time Cut

Client: Consumer drone manufacturer

Challenge: Epicor Kinetic Production Planning reports arrived 10 h after BOM changes, stalling procurement.

Solution: Augmented C# squad replaced Crystal reports with Blazor-based dashboards and introduced incremental MRP runs every 30 min.

Result: PO cycle reduced from 4 days to 36 h; inventory exposure trimmed 19 % while maintaining 99.5 % service level.

Book Your 15-Min Call

120+ C# engineers placed, 4.9/5 avg rating. Need immediate Epicor Kinetic Production Planning expertise? Book a quick discovery call and get a shortlist in 24 h.
Стать исполнителем

Our Core Services

Custom Epicor Add-Ons

Augmented C# engineers craft bespoke Epicor screens, BOM calculators, and mobile apps that bolt seamlessly onto your existing Kinetic instance—extending functionality without disrupting core code and saving internal teams months of R&D.

MRP Algorithm Tuning

Our specialists refactor C# planning logic, introduce multithreading, and leverage constraint-based heuristics, delivering faster, more accurate Epicor Kinetic Production Planning while cutting cloud CPU bills.

Data Migration & ETL

Move legacy ERP, CSV, or SQL data into Epicor with zero downtime. Outstaffed C# experts build robust ETL pipelines, checksum validations, and rollback scripts ensuring every record lands cleanly.

Dashboard & Reporting

Get real-time OEE, scrap, and throughput metrics. Our C# devs harness Blazor and SSRS to create visual dashboards that empower executives to act on fresh Epicor Kinetic insights.

Integration APIs

Connect MES, WMS, e-commerce, and PLM systems through secure RESTful C# micro-services, eliminating data silos and enabling true end-to-end Epicor workflow visibility.

Shop-Floor IoT Bridges

Stream PLC and sensor data directly into Epicor Kinetic Production Planning. Outstaffed C# talent builds MQTT/OPC UA gateways that drive predictive maintenance and line automation.

Want to hire a specialist or a team?

Please fill out the form below:

+ Attach a file

.eps, .ai, .psd, .jpg, .png, .pdf, .doc, .docx, .xlsx, .xls, .ppt, .jpeg

Maximum file size is 10 MB

FAQ